A WELL-KNOWN NAME IN EDINBURGH FOR AIR CONDITIONING
ProAir Conditioning Ltd have operated and installed air conditioning systems in some of the country’s most prestigious and beautiful buildings, covering many varied locations, from nuclear power stations to high street retail outlets. In fact, you could say we have worked in more sectors than ones we have not; we really have gone through the A-Z of businesses over the years!
Our highly qualified engineers provide a full commissioning service for each system to ensure optimum performance. Our goal is to improve living and working conditions for all, and our passion for our industry shines through with each and every project we work on.
IMAGE TO BE SUPPLIED
ESKMILLS ARCHIBALD HOPE HOUSE
PROJECT OVERVIEW:
-
2 No. Panasonic VRF systems
-
2 No. Panasonic Heat Recovery Ventilation Systems
PROJECT VALUE: £89,000 | CLIENT: Eskmills
On this project, ProAir Conditioning Ltd were contracted to supply and install a Comfort Air Conditioning System for a new building refurbishment project for our client at Eskmills. Our brief was to provide a system which would allow the staff to control the temperature conditions within the building office space, enhancing the working environment for all.
An additional requirement on this project was to provide a Centralised Control System which met with the client’s energy consumption monitoring requirement, to allow them to provide accurate energy usage readings for each of their tenants thereby allowing a simple and easy means of providing monthly billing to the tenants for the energy used. This was achieved by the supply and installation of Panasonic Air Conditioning Heat Recovery Air Conditioning Systems complete with Panasonic’s Energy Monitoring Panel which fitted the client brief perfectly having carried out a similar exercise 12 months earlier to another building within the Eskmills Estate.
Although there was an outline design brief, ProAir, in conjunction with the client and consultant provided, detailed air conditioning design and drawings for approval to provide the required services to the first-floor areas required. The external condensers were lifted into position via crane lift with detailed planning and co-ordination paramount to ensure this phase of works ran smoothly and to project plan and timescales.
The air conditioning works included the supply and installation of 2 No. Panasonic VRF heat recovery systems comprising of 22 No. ceiling cassette/ducted type fan coils served via 3 No. Panasonic 3 pipe External Heat Recovery Condensers along with individual remote controllers as required, 2 No. Heat Recovery Ventilation Systems, and all controlled via the Energy Monitoring Panel which was connected into the existing Panasonic Central Control System previously installed. The project included all pipe work, GSS ductwork and insulation, condensate and containment allowing the new installed systems to provide simultaneous heating and cooling to the required areas.
Completion date: August 2019
we included the provision and installation of 4 No. Toshiba DX Coil Condensing Units as part of the ventilation works with the new AHU units providing both supply and extract ventilation to each floor which included fresh air to the intake of the new VRF fan coils and return air from the ceiling void plenum.
ProAir engineers fully commissioned each system to ensure optimum system performance providing much improved conditions for all staff within the office spaces of this building.
Completion date: March 2021