Air Conditioning Maintenance Contracts
Planned preventive maintenance (PPM) is regular, scheduled work carried out to keep equipment in good working order and to optimise its efficiency and accuracy. The primary goal of preventive maintenance is to reduce the possibility of equipment failure before it actually occurs. It is designed to preserve & enhance equipment reliability by replacing worn components before they actually fail.
This activity involves regular, routine cleaning, lubricating, testing, calibrating and adjusting, checking for wear and tear and eventually replacing components to avoid breakdown. The resource and extensive training of our staff ensure that equipment is operated at optimum efficiency and plant life expectancy is extended to maximum potential.
After determining what is to be done, the frequency of the task must be decided. A heavily used air conditioning unit in a server room must be cleaned and checked more frequently than one which is used less often.
The frequency suggested in the manufacturer's manual can be used as a guide, but the actual usage of the air conditioning should determine the maintenance procedure required.
Key Objectives of planned preventive air conditioning maintenance contracts:
- Money saving and energy efficiency
- Optimising up time
- Improving staff efficiency, comfort and air quality
- Comply with current F-Gas legislation
- Reduce the risk of breakdowns or replacement costs
- Longevity of life
Our services
Installation
Centralized operations & customer service center
Maintenance
Regular scheduled work to keep equipment in good working order.
Expert Advice
We are here to offer expert help and advice. Just call the number below
Service
Our fully qualified engineers can service and repair your existing system as well as those we install
Let us Help
Latest News (live)
28th Sept 09 - Daikin increases production
DAIKIN is to employ more staff and ramp up production at its Ostend plant in response to what it sees as "recent positive sales signals". Around 200 production line workers are to be employed on a temporary basis and most production lines will switch from day shift to the two-shift system.
Get in touch
Please use any of the following means to make contact with us:

Unit 53, 30 Sandilands Street
Annick Industrial Estate
Glasgow
G32 0HT
Tel: 0141 778 1011
Email: sales@proairuk.com
Testimonials
"We have used ProAir since they were established and have always received an excellent and efficient service. We are happy to recommend their services to others"
Company News
01st Sept 09
Fall in AC Inspection figures drives classes for trading standards
Contact us
Unit 53, 30 Sandilands Street, Annick Industrial Estate, Glasgow G32 0HT
Tel: 0141 778 1011



